New construction loans in Gainesville.
Lot and vertical construction in one first-position loan for spec homes, infill and build-to-rent. From a direct lender that is open every hour of every day, with an owner on every file.
New construction loans in Gainesville: what to know
New construction in Gainesville includes infill homes and small student-oriented buildings near campus. The city’s zoning near the university is detailed, and we confirm what can be built before lending.
Projects aimed at students need to deliver before August, so we look at the construction schedule as closely as the budget.
Infill near campus and downtown
The city's urban zoning districts around the university and downtown allow multi-story buildings on small lots, and that is where most small-scale construction happens: College Park, University Heights, the Innovation District edge, Porters and the blocks along South Main. Projects range from a pair of townhouses to a three- or four-story apartment building of a dozen units.
Those zones are form-based, with rules on building placement, frontage, height by street type and glazing. Two lots a block apart can allow very different buildings. We ask for the zoning verification and a concept the city's staff has already seen before we lend on a site.
Site constraints that add cost
Trees are the first surprise. Gainesville regulates the removal of large trees closely, and heritage live oaks on an infill lot can shape where the building goes or cost real money in mitigation. Get a tree survey with the boundary survey.
Old neighborhoods mean old utilities. Water and sewer connections, electric service for a multi-unit building and stormwater treatment on a small lot each need design and fees through the city-owned utility and public works. In the University Heights and Pleasant Street districts, demolition of a contributing house needs board approval, which is not assured.
Outside the core, single houses are built on infill lots in East Gainesville and on acreage toward Newberry, Jonesville, Archer and High Springs. On the western limestone plain a builder should consider soil borings, and rural parcels bring well, septic and county driveway permits.
Delivery date and who occupies it
For student-oriented buildings, leasing happens long before the certificate of occupancy. Tenants sign in winter for an August move-in on the strength of drawings and a model. If the building is late, the owner is housing people in hotels or returning deposits, so builders here work backward from the first week of August and leave a margin.
Small projects aimed at graduate students, medical residents and employees are more forgiving. Their leases start throughout the year, though summer is still the busiest period, and they will pay for quiet, parking and in-unit laundry.
For-sale houses in the western suburbs go to families who finance conventionally and compare against large builders' communities. A scattered-lot builder there competes on lot size and finish, and should have the sinkhole and soil questions answered in the file because buyers' insurers ask.
How the loan works
A ground-up loan is the most demanding loan in private lending, for the borrower and the lender both. The collateral does not exist yet. So we underwrite the three things that will make it exist: the plans, the budget and the person building it.
Everything about new construction loans The Gainesville market, area by area
Questions.
Does Think Private Lending make new construction loans in Gainesville?
Yes. We make first-position new construction loans on investment property in Gainesville and throughout Alachua County. Send the deal at any hour and an owner will review it.
Do you finance the land and the construction together?
Yes. Land and vertical construction can be in one first-position loan, with the construction portion released in draws.
Do I need permits in hand to apply?
No. Send the deal as soon as you have plans and a budget. Permit status affects timing and we will talk through it with you.